Saturday, March 04, 2006

Guest room 90% finished

Scott added extra shelves to the bookshelves in the guestroom, and new bedding has been put on the bed (the yellow in the previous photos was my old bedding). There is one more shelf to install in the "closet", which will be above the hanger bar and a TV installed. Then we'll need to figure out how to enclose the closet itself. These are tasks that won't be finished for a couple of months, but I wanted to show the 90% finished room.


Image hosting by Photobucket

Image hosting by Photobucket

Image hosting by Photobucket

Image hosting by Photobucket

Image hosting by Photobucket

Today's task is supposed to be clearing out the flower beds that circle our driveway. Right now they are filled with weeds and bushes that I can't stand. I think we'll be putting down some type of flowering ground cover.

Yesterday (3/3) in Quinlan
High Temperature: 73° F
Low Temperature: 51° F
Precipitation: trace

No comments: